Peace Monument

Aya Park
Ayabe City, Kyoto Prefecture
Client: Ayabe City
Design, Engineering, and Production: Hokkai Iron Works Co., Ltd.
Monument: H-3.5m W-3.0m D-3.0m
Stainless steel mirror finish, OMZP coating
Engineering period: May 2024 - October 2024
Production period: October 2024 - February 2025
In April 2024, a public call for proposals for the Peace Monument was issued, and our company was selected at the end of May 2024.
As the preferred contractor, we worked with the city and related organizations to finalize the design.

